Location: East Wenatchee, wa
Start/finish Date: june 2023 - december 2024
Contract: $6,723,723.00
Description: Sidewalks on both sides of the street with buffer strips; raised intersections; crosswalks and ADA ramps; illumination; storm drainage, utility adjustments, utility relocations, cement concrete driveways, HMA driveways, landscape, irrigation.